Home
Products
Container Series
Heat Exchanger Series
Skid-mounted Equipment
Tower Equipment Series
Boiler Water Jacket Furnace Series
Reactor Series
Water Treatment Series
Other Series
About
Company Profile
Culture
Honors
Factory Appearance
Production Strength
Service
Cases
Blog
Company News
Industry News
Sustainable
Contact
Partners
中文版
English
Español
العربية
12/01
2025
Xilong Footprints: Flash Drum 25R152, Unit No. 1679.
Xilong Equipment: The 1,679th piece of equipment has been completed and successfully shipped.
Xilong Footprints: Saltwater Tank 25R150-C, Unit No. 1677.
Xilong Equipment: The 1,677th piece of equipment has been completed and successfully shipped.
11/30
Xi Long Footprints: R25450-C25225, Units 1613–1676.
Xilong Equipment: Units 1613 to 1676 have been completed and successfully shipped.
11/18
Xilong Footprints: Intelligent Foam-Reducing Agent Filling Device 25QC115-123, Units 1596–1605.
Xilong Equipment: Units 1596 to 1605 have been completed and successfully shipped.
11/16
Xilong Footprints: Chemical Dosing Skid 25QC152-154, Units 1589–1592.
Xilong Equipment: Units 1589–1592 have been completed and successfully shipped.
08/26
Analysis and Introduction of the Function of the Gas Storage Tank
The air pressure of the air compressor is very unstable during operation and has large fluctuations. Using an air storage tank can control the air pressure within a suitable range and eliminate pulsations in the airflow within the pipeline. With the air storage tank, the compressed air output from the air compressor has a buffering area, allowing the air source to be better maintained at a set value, and the air usage system can achieve stable pressure.
05/11
Shandong Xilong: Daily processing of 6000m³ water treatment system implemented at the New Spring Oilfield!
In April 2025, a brand-new water treatment system was officially put into operation at the Chunfeng Joint Station of the New Spring Oil Production Plant, marking a significant improvement in the station's efficient use of water resources and environmentally friendly production levels. The project completed contract signing and commenced production construction in October 2024, and after six months of efficient construction, the commissioning plan was achieved on schedule.
03/19
Shandong Xilong: Held the Appointment Ceremony for Professor Yang Biying
To deepen technological research and development capabilities and accelerate the green and low-carbon transformation process, our company recently held a grand expert consultant appointment ceremony, officially appointing Mr. Yang Biying, an authoritative expert and professor-level senior engineer in the field of thermal engineering and boiler manufacturing, as the company's senior consultant. The company's general manager Wan Jun and heads of various departments attended the ceremony together to witness this important moment of strategic cooperation.
07/17
2024
Shandong Xilong: Gathering "New" Strength, Nurturing Enterprises and Cultivating New Talent, Held the 2024 New Employee Orientation Training
On July 15, 2024, Shandong Xilong welcomed the 2024 batch of fresh university graduates. They came from all over the country, carrying dreams and hopes for the future, gathering in Dongying, Shandong, to jointly embark on a new career journey at Xilong Company.
07/01
Shandong Xilong: Participated in the National Standard Revision Meeting for "General Technical Requirements for Water-Jacketed Heating Furnaces"
On June 27, 2024, the revision meeting for the national standard "General Technical Requirements for Water-Jacketed Heaters," hosted by the National Combustion Energy Conservation and Purification Standardization Technical Committee, was held in Yingkou City, Liaoning Province. Among the many invited participating units, Shandong Xilong Petroleum Equipment Co., Ltd. was included due to its outstanding performance and profound technical expertise in the industry.
HI
Contact an expert for answers now!