Home
Products
Container Series
Heat Exchanger Series
Skid-mounted Equipment
Tower Equipment Series
Boiler Water Jacket Furnace Series
Reactor Series
Water Treatment Series
Other Series
About
Company Profile
Culture
Honors
Factory Appearance
Production Strength
Service
Cases
Blog
Company News
Industry News
Sustainable
Contact
Partners
中文版
English
Español
العربية
01/22
2026
Xilong Footprints: Buffer Tank Skid 25QR179–181, Units 1711–1713.
Xilong Equipment: Units 1711–1713 have been completed and successfully shipped.
12/31
2025
Xilong Footprints: Water Tank Equipment 25C236, Unit No. 1710.
Xilong Equipment: The 1,710th piece of equipment has been completed and successfully shipped.
12/24
Xilong Footprints: Dryer 25R153, Unit No. 1706.
Xilong Equipment: The 1,706th piece of equipment has been completed and successfully shipped.
12/11
Xilong Footprints: Sodium Hypochlorite Dosing Unit 25QC219, the 1,700th unit.
Xilong Equipment: The 1,700th unit has been completed and successfully shipped.
12/09
Xilong Footprints: Absorption Tower 25R153, Unit 1689.
Xilong Equipment: The 1,689th piece of equipment has been completed and successfully shipped.
12/05
Xilong Footprints: Buffer Tank Skid 25R178, Unit No. 1681.
Xilong Equipment: The 1,681st piece of equipment has been completed and successfully shipped.
Xilong Footprints: Light Oil Desulfurization Skid 25R151, Unit No. 1680.
Xilong Equipment: The 1,680th piece of equipment has been completed and successfully shipped.
12/01
Xilong Footprints: Flash Drum 25R152, Unit No. 1679.
Xilong Equipment: The 1,679th piece of equipment has been completed and successfully shipped.
Xilong Footprints: Saltwater Tank 25R150-C, Unit No. 1677.
Xilong Equipment: The 1,677th piece of equipment has been completed and successfully shipped.
11/30
Xi Long Footprints: R25450-C25225, Units 1613–1676.
Xilong Equipment: Units 1613 to 1676 have been completed and successfully shipped.
HI
Contact an expert for answers now!