Shandong Xilong: Participated in the National Standard Revision Meeting for "General Technical Requirements for Water-Jacketed Heating Furnaces"
Category: Company News
Date: 2024-07-01
On June 27, 2024, the revision meeting for the national standard "General Technical Requirements for Water-Jacketed Heaters," hosted by the National Combustion Energy Conservation and Purification Standardization Technical Committee, was held in Yingkou City, Liaoning Province. Among the many invited participating units, Shandong Xilong Petroleum Equipment Co., Ltd. was included due to its outstanding performance and profound technical expertise in the industry.
On June 27, 2024, the revision meeting for the national standard "General Technical Requirements for Water-Jacketed Heaters," hosted by the National Technical Committee for Combustion Energy Conservation and Purification Standardization, was held in Yingkou City, Liaoning Province. Among the many invited participating units, Shandong Xilong Petroleum Equipment Co., Ltd. was included due to its outstanding performance and profound technical accumulation in the industry.
This meeting focused on revising the national standard "General Technical Requirements for Water-Jacketed Heaters," aiming to adapt to the new situation of rapid industry development and improve the scientific, rational, and applicable nature of the standard. Experts and representatives from well-known enterprises across the country gathered to jointly contribute ideas for the revision of the standard.
As a backbone of the industry, Shandong Xilong actively voiced opinions during the meeting. Our representatives, leveraging rich practical experience and keen insight into cutting-edge technologies, engaged in deep and productive exchanges with various parties on key work contents such as technical specifications, quality requirements, and safety indicators in the standard.
During the discussion session, our representatives put forward a series of constructive opinions and suggestions, which received high attention and recognition from attending experts and peers. These suggestions not only fully considered current market demands and technological development trends but also demonstrated the company's sense of responsibility and mission in enhancing industry standards.
Being invited to participate in the national standard revision meeting fully affirms our company's technical strength and industry status in the field of water-jacketed heaters. The company will take this opportunity to continue increasing R&D investment, continuously improve product quality and technical level, and contribute more to promoting the healthy development of the industry.
It is believed that with the joint efforts of all parties, the revised "General Technical Requirements for Water-Jacketed Heaters" will better lead industry development and inject new vitality into the prosperity of China's energy equipment sector.
Keywords: Shandong Xilong: Participated in the National Standard Revision Meeting for "General Technical Requirements for Water-Jacketed Heating Furnaces"
More News
Company News
-
Xilong Footprints: 5 intake buffer tanks and 4 exhaust buffer tanks, BYS25025-1 to 5 and 7 to 10; units 1745 to 1754.
Time2026-03-23
-
Xilong Footprints: Gravity Separator Nos. 26QR164–166; Units 1742–1744.
Time2026-03-21
-
Xilong Footprints: High‑precision filters 26C015 and 16; Unit 1739–1740.
Time2026-03-11
-
Xilong Footprints: Mixed-ingredient tanks 25QC180, 182, 184, 186, and 188, units 1732–1737.
Time2026-02-28
-
Xilong Footprints: Methanol Refueling Skid 25QC019, Unit No. 1729.
Time2026-02-25
-
Xilong Footprints: Self-Acting Drainage Skid 25QC223, Unit No. 1725.
Time2026-02-03
-
Xilong Footprints: Corrosion Inhibitor Injection Skid 25QC130, Unit No. 1724.
Time2026-02-03
-
Xilong Footprints: Mixed-ingredient tanks 25QC170, 172, 174, 176, and 188, units 1719–1723.
Time2026-02-03
-
Xilong Footprints: Integrated Heating and Throttling Device, 25C098, Unit No. 1718.
Time2026-01-26
-
Xilong Footprints: 1000 kW Water-Jacket Heating Furnace, 25QC217~218, Units 1716–1717.
Time2026-01-26
-
Xilong Footprints: Buffer Tank Skid 25QR179–181, Units 1711–1713.
Time2026-01-22
-
Xilong Footprints: Water Tank Equipment 25C236, Unit No. 1710.
Time2025-12-31
-
Xilong Footprints: Dryer 25R153, Unit No. 1706.
Time2025-12-24
-
Xilong Footprints: Sodium Hypochlorite Dosing Unit 25QC219, the 1,700th unit.
Time2025-12-11
-
Xilong Footprints: Absorption Tower 25R153, Unit 1689.
Time2025-12-09
-
Xilong Footprints: Buffer Tank Skid 25R178, Unit No. 1681.
Time2025-12-05
-
Xilong Footprints: Light Oil Desulfurization Skid 25R151, Unit No. 1680.
Time2025-12-05
-
Xilong Footprints: Flash Drum 25R152, Unit No. 1679.
Time2025-12-01
-
Xilong Footprints: Saltwater Tank 25R150-C, Unit No. 1677.
Time2025-12-01
-
Xi Long Footprints: R25450-C25225, Units 1613–1676.
Time2025-11-30
-
Xilong Footprints: Intelligent Foam-Reducing Agent Filling Device 25QC115-123, Units 1596–1605.
Time2025-11-18
-
Xilong Footprints: Chemical Dosing Skid 25QC152-154, Units 1589–1592.
Time2025-11-16
-
Shandong Xilong: Daily processing of 6000m³ water treatment system implemented at the New Spring Oilfield!
Time2025-05-11
-
Shandong Xilong: Held the Appointment Ceremony for Professor Yang Biying
Time2025-03-19
-
Shandong Xilong: Gathering "New" Strength, Nurturing Enterprises and Cultivating New Talent, Held the 2024 New Employee Orientation Training
Time2024-07-17
-
Shandong Xilong: Participated in the National Standard Revision Meeting for "General Technical Requirements for Water-Jacketed Heating Furnaces"
Time2024-07-01
-
Shandong Xilong: Hosting a Job Skills Competition with the Theme "Craftsmanship Forged by a Welding Torch"
Time2024-05-25
-
Shandong Xilong: Broadly recruiting talents, serving employment.
Time2024-04-10
-
Shandong Xilong: Launching the "Implementing the 20th National Congress, On-site Competition" Riveting Skills Contest
Time2023-09-15
Industry News
-
Xilong Footprints: 5 intake buffer tanks and 4 exhaust buffer tanks, BYS25025-1 to 5 and 7 to 10; units 1745 to 1754.
Time2026-03-23
-
Xilong Footprints: Gravity Separator Nos. 26QR164–166; Units 1742–1744.
Time2026-03-21
-
Xilong Footprints: High‑precision filters 26C015 and 16; Unit 1739–1740.
Time2026-03-11
-
Analysis and Introduction of the Function of the Gas Storage Tank
Time2025-08-26
-
Key Points for the Safe Use of Low-Temperature Liquid Oxygen Storage Tanks
Time2022-08-25
-
What are the types of gas storage tanks?
Time2022-08-01
-
Common Faults and Cause Analysis of Safety Valves in Gas Storage Tanks
Time2022-07-13







