Shandong Xilong: Launching the "Implementing the 20th National Congress, On-site Competition" Riveting Skills Contest
Category: Company News
Date: 2023-09-15
Recently, the company organized a study session on the basics of "Pressure Vessel Production Process" to improve the professional application skills of riveters, ensuring "safe production and quality assurance" during construction operations. Subsequently, a basic knowledge exam for the "2023 Second Riveter Skills Competition" was held in the production area, with middle management participating in the examination process and supervising the scoring to ensure fairness and justice in the competition.
Recently, the company organized a study session on the basics of "Pressure Vessel Production Process" to improve the professional application skills of riveters, ensuring "safe production and quality assurance" during construction operations. Afterwards, a basic knowledge exam for the "2023 Second Riveter Skills Competition" was held in the production area, with middle management participating in the examination and supervision of scoring to ensure fairness and justice in the competition.
The successful completion of this skills competition not only played a role in "promoting learning and training through competition," but also encouraged employees to learn from each other, complement each other's strengths, and strive to improve their skills in future work, laying a solid foundation for high-level production.
Keywords: Shandong Xilong: Launching the "Implementing the 20th National Congress, On-site Competition" Riveting Skills Contest
More News
Company News
-
Xilong Footprints: 5 intake buffer tanks and 4 exhaust buffer tanks, BYS25025-1 to 5 and 7 to 10; units 1745 to 1754.
Time2026-03-23
-
Xilong Footprints: Gravity Separator Nos. 26QR164–166; Units 1742–1744.
Time2026-03-21
-
Xilong Footprints: High‑precision filters 26C015 and 16; Unit 1739–1740.
Time2026-03-11
-
Xilong Footprints: Mixed-ingredient tanks 25QC180, 182, 184, 186, and 188, units 1732–1737.
Time2026-02-28
-
Xilong Footprints: Methanol Refueling Skid 25QC019, Unit No. 1729.
Time2026-02-25
-
Xilong Footprints: Self-Acting Drainage Skid 25QC223, Unit No. 1725.
Time2026-02-03
-
Xilong Footprints: Corrosion Inhibitor Injection Skid 25QC130, Unit No. 1724.
Time2026-02-03
-
Xilong Footprints: Mixed-ingredient tanks 25QC170, 172, 174, 176, and 188, units 1719–1723.
Time2026-02-03
-
Xilong Footprints: Integrated Heating and Throttling Device, 25C098, Unit No. 1718.
Time2026-01-26
-
Xilong Footprints: 1000 kW Water-Jacket Heating Furnace, 25QC217~218, Units 1716–1717.
Time2026-01-26
-
Xilong Footprints: Buffer Tank Skid 25QR179–181, Units 1711–1713.
Time2026-01-22
-
Xilong Footprints: Water Tank Equipment 25C236, Unit No. 1710.
Time2025-12-31
-
Xilong Footprints: Dryer 25R153, Unit No. 1706.
Time2025-12-24
-
Xilong Footprints: Sodium Hypochlorite Dosing Unit 25QC219, the 1,700th unit.
Time2025-12-11
-
Xilong Footprints: Absorption Tower 25R153, Unit 1689.
Time2025-12-09
-
Xilong Footprints: Buffer Tank Skid 25R178, Unit No. 1681.
Time2025-12-05
-
Xilong Footprints: Light Oil Desulfurization Skid 25R151, Unit No. 1680.
Time2025-12-05
-
Xilong Footprints: Flash Drum 25R152, Unit No. 1679.
Time2025-12-01
-
Xilong Footprints: Saltwater Tank 25R150-C, Unit No. 1677.
Time2025-12-01
-
Xi Long Footprints: R25450-C25225, Units 1613–1676.
Time2025-11-30
-
Xilong Footprints: Intelligent Foam-Reducing Agent Filling Device 25QC115-123, Units 1596–1605.
Time2025-11-18
-
Xilong Footprints: Chemical Dosing Skid 25QC152-154, Units 1589–1592.
Time2025-11-16
-
Shandong Xilong: Daily processing of 6000m³ water treatment system implemented at the New Spring Oilfield!
Time2025-05-11
-
Shandong Xilong: Held the Appointment Ceremony for Professor Yang Biying
Time2025-03-19
-
Shandong Xilong: Gathering "New" Strength, Nurturing Enterprises and Cultivating New Talent, Held the 2024 New Employee Orientation Training
Time2024-07-17
-
Shandong Xilong: Participated in the National Standard Revision Meeting for "General Technical Requirements for Water-Jacketed Heating Furnaces"
Time2024-07-01
-
Shandong Xilong: Hosting a Job Skills Competition with the Theme "Craftsmanship Forged by a Welding Torch"
Time2024-05-25
-
Shandong Xilong: Broadly recruiting talents, serving employment.
Time2024-04-10
-
Shandong Xilong: Launching the "Implementing the 20th National Congress, On-site Competition" Riveting Skills Contest
Time2023-09-15
Industry News
-
Xilong Footprints: 5 intake buffer tanks and 4 exhaust buffer tanks, BYS25025-1 to 5 and 7 to 10; units 1745 to 1754.
Time2026-03-23
-
Xilong Footprints: Gravity Separator Nos. 26QR164–166; Units 1742–1744.
Time2026-03-21
-
Xilong Footprints: High‑precision filters 26C015 and 16; Unit 1739–1740.
Time2026-03-11
-
Analysis and Introduction of the Function of the Gas Storage Tank
Time2025-08-26
-
Key Points for the Safe Use of Low-Temperature Liquid Oxygen Storage Tanks
Time2022-08-25
-
What are the types of gas storage tanks?
Time2022-08-01
-
Common Faults and Cause Analysis of Safety Valves in Gas Storage Tanks
Time2022-07-13
Next: None







