Announcement of the Results and Awards of the First Welding Skills Competition
Date: 2025-08-19
To improve various welding skills of welders, enhance the quality awareness of the production team, and stimulate employees' enthusiasm for practicing welding techniques, thereby fundamentally ensuring the pass rate of flaw detection and gradually improving welding efficiency, the Quality Inspection Department led, with the cooperation of the Production Department, a skills competition titled "2023 First Shielded Metal Arc Welding Butt and Fillet Weld" was held at 1:00 PM on February 14, 2023, in Workshop No. 3 of the factory area. During the event, the company's middle and senior management, Technical Department, and Comprehensive Management Department jointly witnessed the entire competition process and supervised the scoring process to ensure fairness and justice.
To improve various welding skills of welders, enhance the quality awareness of the production team, and stimulate employees' enthusiasm for practicing welding techniques, in order to fundamentally ensure the flaw detection pass rate and gradually improve welding efficiency, the Quality Inspection Department led, with the cooperation of the Production Department, a skills competition titled "CO2 Gas Shielded Arc Welding Butt Joint Fillet Weld" on February 14, 2023, at 1 PM in Workshop No. 3 of the factory. During the event, the company's middle and senior management, Technical Department, and General Management Department jointly witnessed the entire competition process and supervised the scoring to ensure fairness and justice.
After comprehensive and meticulous evaluation of the welding test plates by four judges, according to the relevant provisions of the "Welder Skills Competition Examination Notice," the top 5 employees with outstanding scores in this competition were rewarded and publicly announced.
It is hoped that this welding skills competition can truly play the role of "promoting learning through competition and promoting training through competition." We hope all employees will learn from each other, complement each other's strengths and weaknesses in future work, strive to improve their own abilities, and grow together with the team!
Keywords: Announcement of the Results and Awards of the First Welding Skills Competition
More News
Company News
-
Xilong Footprints: 5 intake buffer tanks and 4 exhaust buffer tanks, BYS25025-1 to 5 and 7 to 10; units 1745 to 1754.
Time2026-03-23
-
Xilong Footprints: Gravity Separator Nos. 26QR164–166; Units 1742–1744.
Time2026-03-21
-
Xilong Footprints: High‑precision filters 26C015 and 16; Unit 1739–1740.
Time2026-03-11
-
Xilong Footprints: Mixed-ingredient tanks 25QC180, 182, 184, 186, and 188, units 1732–1737.
Time2026-02-28
-
Xilong Footprints: Methanol Refueling Skid 25QC019, Unit No. 1729.
Time2026-02-25
-
Xilong Footprints: Self-Acting Drainage Skid 25QC223, Unit No. 1725.
Time2026-02-03
-
Xilong Footprints: Corrosion Inhibitor Injection Skid 25QC130, Unit No. 1724.
Time2026-02-03
-
Xilong Footprints: Mixed-ingredient tanks 25QC170, 172, 174, 176, and 188, units 1719–1723.
Time2026-02-03
-
Xilong Footprints: Integrated Heating and Throttling Device, 25C098, Unit No. 1718.
Time2026-01-26
-
Xilong Footprints: 1000 kW Water-Jacket Heating Furnace, 25QC217~218, Units 1716–1717.
Time2026-01-26
-
Xilong Footprints: Buffer Tank Skid 25QR179–181, Units 1711–1713.
Time2026-01-22
-
Xilong Footprints: Water Tank Equipment 25C236, Unit No. 1710.
Time2025-12-31
-
Xilong Footprints: Dryer 25R153, Unit No. 1706.
Time2025-12-24
-
Xilong Footprints: Sodium Hypochlorite Dosing Unit 25QC219, the 1,700th unit.
Time2025-12-11
-
Xilong Footprints: Absorption Tower 25R153, Unit 1689.
Time2025-12-09
-
Xilong Footprints: Buffer Tank Skid 25R178, Unit No. 1681.
Time2025-12-05
-
Xilong Footprints: Light Oil Desulfurization Skid 25R151, Unit No. 1680.
Time2025-12-05
-
Xilong Footprints: Flash Drum 25R152, Unit No. 1679.
Time2025-12-01
-
Xilong Footprints: Saltwater Tank 25R150-C, Unit No. 1677.
Time2025-12-01
-
Xi Long Footprints: R25450-C25225, Units 1613–1676.
Time2025-11-30
-
Xilong Footprints: Intelligent Foam-Reducing Agent Filling Device 25QC115-123, Units 1596–1605.
Time2025-11-18
-
Xilong Footprints: Chemical Dosing Skid 25QC152-154, Units 1589–1592.
Time2025-11-16
-
Shandong Xilong: Daily processing of 6000m³ water treatment system implemented at the New Spring Oilfield!
Time2025-05-11
-
Shandong Xilong: Held the Appointment Ceremony for Professor Yang Biying
Time2025-03-19
-
Shandong Xilong: Gathering "New" Strength, Nurturing Enterprises and Cultivating New Talent, Held the 2024 New Employee Orientation Training
Time2024-07-17
-
Shandong Xilong: Participated in the National Standard Revision Meeting for "General Technical Requirements for Water-Jacketed Heating Furnaces"
Time2024-07-01
-
Shandong Xilong: Hosting a Job Skills Competition with the Theme "Craftsmanship Forged by a Welding Torch"
Time2024-05-25
-
Shandong Xilong: Broadly recruiting talents, serving employment.
Time2024-04-10
-
Shandong Xilong: Launching the "Implementing the 20th National Congress, On-site Competition" Riveting Skills Contest
Time2023-09-15
Industry News
-
Xilong Footprints: 5 intake buffer tanks and 4 exhaust buffer tanks, BYS25025-1 to 5 and 7 to 10; units 1745 to 1754.
Time2026-03-23
-
Xilong Footprints: Gravity Separator Nos. 26QR164–166; Units 1742–1744.
Time2026-03-21
-
Xilong Footprints: High‑precision filters 26C015 and 16; Unit 1739–1740.
Time2026-03-11
-
Analysis and Introduction of the Function of the Gas Storage Tank
Time2025-08-26
-
Key Points for the Safe Use of Low-Temperature Liquid Oxygen Storage Tanks
Time2022-08-25
-
What are the types of gas storage tanks?
Time2022-08-01
-
Common Faults and Cause Analysis of Safety Valves in Gas Storage Tanks
Time2022-07-13







